| PERMIT TO WORK |
Table
of Content
- Basic Permit Details.
- Hazards of Non-Compliance to PTW/ LOTO.
- Scope of Permit.
- Definitions.
- Competent Person responsibilities.
- Senior Authorized Person responsibilities.
- Authorized Person responsibilities.
- Control Person responsibilities.
- Types of Permits.
- Types of Certificates.
- LOTO 6 Steps.
- LOTO System at…..
- LOTO Sequence at…..
- Risk Assessment Technique.
- Risk Assessment at……..
Basic
Permit Details
- What is a permit?
It’s a part of a safe system of work to control high-risk activities, such as hot work, confined spaces, excavation, and work on electrical equipment.
It ensures that all risks have been identified, precautions are in place before, during, and after work, and appropriate information is communicated to all relevant parties. - Permit to Work (PTW):
A formal document specifying the work to be done, hazards, and precautions. It provides a clear written record signed by a responsible person/supervisor that all foreseeable hazards have been considered and necessary actions taken. Must be in possession of the person in charge before work commences. - Common Sections of PTW:
Issue, Acceptance, Clearance, Cancellation.
Hazards
of Non-Compliance to PTW/ LOTO
- Puts team at fatal risk due to:
Hazardous substances, hot/cold temperatures, electrical hazards, mechanical energy hazards, hazardous areas, height dangers, radioactive substances, dangerous fumes. - Puts equipment and business at risk.
- Puts environment at risk.
- Leads to direct costs (first-aid, hospital treatment,
equipment replacement, overtime).
- Leads to indirect costs (loss of competent staff,
morale, investigation costs, loss of customer goodwill, overtime to meet
deadlines, recruitment/training costs).
Scope
of Permit
- This contains Procedure, Definition, and Guidelines. It
is only applicable to commissioning activities at the PROJECT SITE.
Definitions
(Multiple slides titled
"Definitions" with placeholder content – specific definitions not
detailed in provided text.)
Competent
Person Responsibilities
- Shall comply with Safety Rules stated in [].
- Works within the limit of the work scope of the permit.
- Retains Safety Document and Keys in safe custody and
displays at job location.
- Provides immediate/personal supervision as required.
- Warns and withdraws personnel if hazards arise.
- Reports hazards to Senior Authorized Person.
- Signs clearance only when site is safe.
- Ensures tools/gear removed, guards replaced,
housekeeping done.
- Manages permit transfer/suspension with Senior
Authorized Person.
- Provides personal supervision for restoration of power
(PFW) or tests (SFT).
HEI-Contractor’s Competent Person
Authorization:
Nominated by Department Manager/Lead via email to Project & Commissioning
Manager. Approved after interview on PTW, LOTO & Risk Assessment.
Competent Person = KATE:
K = Knowledge, A = Ability, T = Training, E = Experience.
Senior
Authorized Person Responsibilities
- Complies with Safety Rules stated in [].
- Implements procedures for releasing Plant/Apparatus for
work/testing.
- Ensures all safety precautions are completed.
- Obtains agreement from Control Person for release.
- Confirms safety precautions with Control Person for HV
systems.
- Ensures feedback is considered.
- Decides on drain earths, venting, purging, and stored
energy.
- Specifies conditions for removing/reapplying safety
precautions.
- Issues Safety Document, keys, and decides supervision
level.
- Manages transfer/suspension of Safety Documents.
- Informs Control Person upon completion.
- Cancels Safety Document and ensures Plant/Apparatus is
ready for service.
- Decides work/testing limits and issues Limited Work
Permit if needed.
- Determines LV work method (routine, Safety Document, or
Personal Supervision).
Authorized
Person Responsibilities
- Carries out work area inspection and follows SAP instructions.
- Receives Isolation Certificate, locks, and tags from
SAP to effect isolation.
- Records name, date, time, and signs Isolation
Certificate.
- Hands over keys to SAP for permit issuance.
- Removes isolations upon SAP’s request after permit
cancellation.
- Performs switching operations up to 6.6kV; above that
is Control Person’s responsibility.
- For Sanction for Test: removes isolations as requested,
signs, and hands permit to Competent Person.
- May be required to be present during testing.
- Reinstates safety precautions after testing.
- Ensures security of isolations, guards, safety devices,
and stored energy dissipation.
Control
Person Responsibilities
- Agrees to release of Plant/Apparatus for work/testing.
- Acknowledges completion of work/testing and any
restrictions on returning to service.
- Takes over plant/apparatus after permit cancellation
and isolations removed by Authorized Person.
Types
of Permits
- Permit for Work:
Used when precautions are needed to achieve safety for work on apparatus. Protects employees in hazardous situations. - Limited Work Permit:
Used when limiting work/access alone ensures safety. No isolation required. - Sanction for Test:
Used for testing with adequate precautions. Requires surrender of other permits; only one safety document issued.
Types
of Certificates
- Isolated:
Disconnected by isolating device, physical separation, or sufficient gap. - Hot Work:
Work involving burning, welding, cutting, grinding, or spark-producing tools. - Confined Space:
Not designed for permanent occupancy, limited access/egress, large enough for one person to enter. - Excavation:
Moving earth/rock with tools, equipment, or explosives for construction. - Radiation:
Emission of energy as waves/particles (e.g., radio waves, X-rays, gamma radiation). - Diving:
Descending in water for inspection, maintenance, filming, or recording.
General Instructions
- Duration of permit & certificates: 1 whole shift,
then reissued.
- Permit transferable up to 2 weeks from issue, then
cleared/cancelled.
- Possible attachments: Required Certificates, Key Safe
Key, Daily TBT, Risk Assessment, Confined Space Log, Rescue Plan, and Hot
Work Monitoring Sheet.
- Suspended during plant emergency; reissued after SAP
approval.
- Transfer required if SAP or CP changes.
- Isolations in Isolation Certificate must be reviewed
before permit issuance.
LOTO
6 Steps
- Preparation:
SAP & AP investigate hazardous energy. CP can request isolations.
- Shut Down:
Control Person initiates shutdown. AP may do so if nominated by SAP.
- Isolation:
Isolate from energy sources (electrical, hydraulic, pneumatic, etc.) as
per Isolation Certificate.
- Lockout/Tagout:
Attach locks/tags to energy-isolating devices. Fill tags with name, sign, and
contact number.
- Stored Energy Check:
Release residual/stored energy (e.g., venting, purging).
- Isolation Verification: Authorized Person verifies isolation. CP checks
isolations before work begins.
LOTO
System at ….
(Placeholder content – system
description not detailed in provided text.)
LOTO
Sequence at …..
- SAP designates person to apply isolation locks/tags at
equipment.
- Isolation keys placed in Key Safe box.
- Control Lock Key moved to Key Safe Cabinet and secured
by SAP.
- Key Safe box key handed to Competent Person upon permit
acceptance.
- Multiple work sections: multiple Key Safe locks
applied.
- After job completion, CP returns Key Safe keys to SAP.
- SAP removes Key Safe locks and opens Key Safe.
- Isolation keys released for de-isolation after control
lock removal.
Risk
Assessment Technique
- Risk:
Likelihood of harm combined with severity.
- Hazard:
Something that can cause harm (e.g., electricity, chemicals).
- Risk Assessment:
Formal process to identify hazards, assess risk, and eliminate/control it.
Objectives:
- Prevent death, injury, loss incidents.
- Avoid legal breaches and prosecution.
- Reduce direct/indirect costs after accidents.
Five Steps of Risk Assessment:
- Identify hazards.
- Identify people at risk and how.
- Evaluate risk and decide precautions.
- Record findings and implement.
- Review and update.
Hazard Identification Methods:
- Inspection.
- Task Analysis (SREDIM):
- Select task
- Record steps
- Evaluate risks
- Develop safe method
- Implement method
- Monitor effectiveness
- Legislation
- Manufacturer Information
- Incident Data
Identifying Population at Risk:
- Workers/operators
- Maintenance staff
- Cleaners
- Contractors
- Visitors
- Public
Risk
Assessment at …..
(Placeholder content ...)