A - Activities

  • Air Conditioning Commissioning System
  • Handling plant
  • Installing plant at the height
  • Lifting plant with mechanical equipment
  • Installing ductwork
  • Installing ductwork at height 

B - Hazard/ Impact

  1. Sharp or jagged edges
  2. Unintended falls of material/tools/debris
  3. Fall of material/equipment/tools
  4. Contact with sealants
  5. Fall of Person
  6. Exposure to dust/debris
  7. Poor handling technique
  8. Cuts, abrasions, eye injuries and breathing difficulties
  9. Muscular skeletal injuries
  10. Cuts/abrasions                            
  11. Death or serious injury
  12. Serious injuries - possibly life-threatening
  13. Long term health problems - fatal
  14. Death or serious injury

Who at Risk?

  • Those near ducting outlet
  • Operatives and those passing below
  • Persons doing the work and those in the immediate area
  • Barriers and signage will be positioned to exclude persons from the area below the works

Occupation Health and Safety Controls

  • Minimize or reduce the risk of injury by practicing the following technical and informative guidelines:
  • Control Measures that should be already in place
  • Persons not required to be in the vicinity of the duct outlets will be kept out of the area
  • Ducting system cleaned regularly during installation and immediately before commissioning
  • Manual Handling assessment carried out
  • Refer to risk assessment for specific access equipment used
  • Refer to risk assessment for specific lifting equipment used
  • Additional Control Measures Needed
  • Dust masks, gloves and eye protection to be worn by those in the vicinity of duct outlets during Commissioning
  • Warning signs to be placed around duct outlets during system commissioning
  • Appropriate gloves suitable for the task provided
  • Refer to risk assessment (RA) for particularly lifting equipment used
  • Refer to COSHH assessment for use of sealants
  • Refer to risk assessment for specific access equipment used
  • Loose materials and equipment will be cleared regularly
  • Persons not required to be in the vicinity of the duct outlets will be kept out of the area
  • Ducting system cleaned regularly during installation and immediately before commissioning
  • Manual Handling assessment carried out

Download File

1 comment:

  1. The forced air systems that are planned with the most recent innovations that you can without much of a stretch control with your forced air system controller essentially sitting at your place thus you want not need to go to your climate control system to manual do it in it. www.climamatic.com/climatizadores/index

    ReplyDelete

Kindly do not enter any spam link in the comment box

Advertising

You have installed an Ad-Blocker on your System!
This HSE Documents Site is funded by ADVERTISEMENTS only. To keep https://www.hsedocuments.com for free in the future, please deactivate your Ad-Blocker!